相关产品推荐更多 >
万千商家帮你免费找货
0 人在求购买到急需产品
- 详细信息
- 文献和实验
- 技术资料
- 供应商:
上海博耀商贸有限公司
风险提示:丁香通仅作为第三方平台,为商家信息发布提供平台空间。用户咨询产品时请注意保护个人信息及财产安全,合理判断,谨慎选购商品,商家和用户对交易行为负责。对于医疗器械类产品,请先查证核实企业经营资质和医疗器械产品注册证情况。
文献和实验UPDATED DIRECTIONS FOR NEW BRUNSWICK MOBILE PILOT PLANT FERMENTOR
line selonoid to seal the exhaust line. 3. Turn off fermentor electrical power at the main switch. 4. Turn off the steam and water service lines. 5. The vessel should maintain pressure for at least two hours if the system is sealed properly
Procedure to purify protein from cells
the walls of the tube. SONICATION 1.Turn on the sonicator and calibrate by placing the 20/40 switch in the 20 possition and the control power switch in the 60 postion.Start the apparatus by pressing the foot pedal and move the calibration knob
in the ice container making sure that the ice bath completly covers the walls of the tube. SONICATION Turn on the sonicator and calibrate by placing the 20/40 switch in the 20 possition and the control power switch in the 60 postion
技术资料暂无技术资料 索取技术资料





